Other completed projects
  • Umid settlement Youth Center Capital Maintenance and Restoration
  • Holcim Cement Plant Construction of the New Tire Washing Station
  • PMD Projects Qalalti Hotel fit-out Works
  • Norm Cement Plant construction of the main water pipeline and wastewater system
  • Holcim Cement Plant Maintenance and Restoration of facility buildings
  • McDonald’s Azerbaijan Fit-out Works
  • Norm Cement Plant Capital Maintenance and Restoration of concrete surfaces
  • Installation of 2500 m cable trays for Shahqaya quarry at Holcim Cement Plant
  • Adjustment and Repair of fans at Norm Cement Plant
  • Concrete works to prevent rainwater ingress to the lower level of line 321 BC 02 at Norm Cement

Scaffolding Projects

  • The Dispensary Against Cancer No. 4
  • Baku Health Centre
  • SOCAR Administrative Building
  • Neftyol T.T. – Assembling of the scaffolds for concrete works
  • “Dada Gorgud” Submersible Drilling Rig
  • “Khankendi” Subsea Construction Vessel

Mechanical, Electrical and Plumbing Projects

MEP works for Boiler Rooms of Schools. Ministry of Education of Azerbaijan Republic

  • Quba District – 4 Schools
  • Khachmaz District – 2 Schools
  • Shabran District – 2 Schools
  • MEP works in pump rooms, boiler rooms and swimming pools of the dormitory camp for 514 people. AzeraqrarTikinti
  • Installation of the HVAC, plumbing systems, pump stations, fire and gas detection and fighting systems. Ministry of Agriculture of Azerbaijan Republic
  • Khachmaz, Sheki and Aghjabadi Districts
  • Installation of the HVAC, boiler rooms, pump stations, plumbing systems and F&G detection and fighting systems. Ministry of Defense of Azerbaijan Republic
  • Goranboy and Beylaqan Districts
  • Installation of boiler room, chiller, HVAC, F&G detection and fighting systems, pump station and plumbing systems. Azerbaijan State Flag Square
  • Installation of communication systems for schools. State Committee for Affairs of Refugees and Internally Displaced Persons of the Republic of Azerbaijan
  • Sumqayit city and Kurdakhani Districts
  • Construction of 5 km irrigation system, installation of 5 ea 90 kVt pumps and 3 ea 2000 m3 water tanks in Fuzuli District
  • Installation of the wastewater treatment equipment and pump station as per the outstanding technical requirements. U.S. Embassy in Azerbaijan Republic
  • Construction of the new administrative building of Sheki District Court and Installation of the Climate Control System. World Bank and Ministry of Justice of Azerbaijan Republic

Blasting, Coating, and Insulation Projects

  • SOCAR Carbamide Plant – Blasting and Painting of the Storage Tanks
  • Norm Cement Plant – Blasting and Painting of the kilns
  • Norm Cement Plant – Isolation of the Roof
  • North-West Construction – Blasting and Coating of the Pipes
  • Pasha Construction – Blasting and Painting of the Metal Structures
  • Norm Cement Plant - Waterproofing of the bag storage roof at the level of +8000mm

Structural Projects

  • Replacement and Repairing of the out-of-order and damaged structures for the Holcim Cement Plant
  • Construction of the Mobile Schools
  • Maintenance and Installation of Mechanical Components, hull, and tanks of 150 m Grain Ship
  • Fabrication and installation of the sliding roof above the main bag filter and the upper filter chamber at NORM Cement Plant

Rope Access Projects

  • Norm Cement Plant – Installation of the lifeline system
  • Norm Cement Plant – repair works on the roof of the buildings
  • Norm Cement Plant – Installation of the lifeline system on the roofs of office, dining and fitting rooms
  • Norm Cement Plant – cleaning works inside of the chimney, concrete pouring works
  • Azinko Holding – Installation and replacement of stained glasses and isolation works
  • Baku Aquatic Palace installation of the fire fighting system and MEP works
  • Mingachevir Hydro Power Plant – painting works