Umid settlement Youth Center Capital Maintenance and Restoration
Holcim Cement Plant Construction of the New Tire Washing Station
PMD Projects Qalalti Hotel fit-out Works
Norm Cement Plant construction of the main water pipeline and wastewater system
Holcim Cement Plant Maintenance and Restoration of facility buildings
McDonald’s Azerbaijan Fit-out Works
Norm Cement Plant Capital Maintenance and Restoration of concrete surfaces
Installation of 2500 m cable trays for Shahqaya quarry at Holcim Cement Plant
Adjustment and Repair of fans at Norm Cement Plant
Concrete works to prevent rainwater ingress to the lower level of line 321 BC 02 at Norm Cement
Scaffolding Projects
The Dispensary Against Cancer No. 4
Baku Health Centre
SOCAR Administrative Building
Neftyol T.T. – Assembling of the scaffolds for concrete works
“Dada Gorgud” Submersible Drilling Rig
“Khankendi” Subsea Construction Vessel
Mechanical, Electrical and Plumbing Projects
MEP works for Boiler Rooms of Schools. Ministry of Education of Azerbaijan Republic
Quba District – 4 Schools
Khachmaz District – 2 Schools
Shabran District – 2 Schools
MEP works in pump rooms, boiler rooms and swimming pools of the dormitory camp for 514 people. AzeraqrarTikinti
Installation of the HVAC, plumbing systems, pump stations, fire and gas detection and fighting systems. Ministry of Agriculture of Azerbaijan Republic
Khachmaz, Sheki and Aghjabadi Districts
Installation of the HVAC, boiler rooms, pump stations, plumbing systems and F&G detection and fighting systems. Ministry of Defense of Azerbaijan Republic
Goranboy and Beylaqan Districts
Installation of boiler room, chiller, HVAC, F&G detection and fighting systems, pump station and plumbing systems. Azerbaijan State Flag Square
Installation of communication systems for schools. State Committee for Affairs of Refugees and Internally Displaced Persons of the Republic of Azerbaijan
Sumqayit city and Kurdakhani Districts
Construction of 5 km irrigation system, installation of 5 ea 90 kVt pumps and 3 ea 2000 m3 water tanks in Fuzuli District
Installation of the wastewater treatment equipment and pump station as per the outstanding technical requirements. U.S. Embassy in Azerbaijan Republic
Construction of the new administrative building of Sheki District Court and Installation of the Climate Control System. World Bank and Ministry of Justice of Azerbaijan Republic
Blasting, Coating, and Insulation Projects
SOCAR Carbamide Plant – Blasting and Painting of the Storage Tanks
Norm Cement Plant – Blasting and Painting of the kilns
Norm Cement Plant – Isolation of the Roof
North-West Construction – Blasting and Coating of the Pipes
Pasha Construction – Blasting and Painting of the Metal Structures
Norm Cement Plant - Waterproofing of the bag storage roof at the level of +8000mm
Structural Projects
Replacement and Repairing of the out-of-order and damaged structures for the Holcim Cement Plant
Construction of the Mobile Schools
Maintenance and Installation of Mechanical Components, hull, and tanks of 150 m Grain Ship
Fabrication and installation of the sliding roof above the main bag filter and the upper filter chamber at NORM Cement Plant
Rope Access Projects
Norm Cement Plant – Installation of the lifeline system
Norm Cement Plant – repair works on the roof of the buildings
Norm Cement Plant – Installation of the lifeline system on the roofs of office, dining and fitting rooms
Norm Cement Plant – cleaning works inside of the chimney, concrete pouring works
Azinko Holding – Installation and replacement of stained glasses and isolation works
Baku Aquatic Palace installation of the fire fighting system and MEP works