Pre-Comissioning

Hydrostatic testing 

 

  • Preparation of the Design Drawings and Procurement List for Fabrication of Pig Launchers/Receivers,
  • High Pressure Test Heads, Test Manifold, Test Cabin Instrumentation Layouts
  • Preparation of hydrostatic test and pigging calculations for under-ground and above ground
  • Piping/pipeline systems
  • Planning of the plant shutdown-maintenance activities
  • Preparation of the hydrostatic testing philosophies and risk assessments

 

Method Statements, Procedures & Specifications

 

  • Preparation of Specifications for Piping, Pipeline, Process, Civil, Structural, Geotechnical, Electrical, Instrumentation, Telecom, Corrosion, Welding, Coating, and Painting Activities
  • Preparation of Procedure for Operation of Oil & Gas Facilities
  • Preparation of Procedure for Hydrostatic Testing & Test Packs
  • Preparation of Procedure for Flange Management
  • Preparation of Procedure for Preservation activities

 

As-built Documentation and Close-out

 

  • As-built Data Collection, Verification & Sort Out
  • Redline Mark-up (RLMU) and back drafting
  • Preparation of the As-built Spreadsheets for Geospatial Models