Client: NORM OJSC

Contractor: HECOTEC LLC

 

Scope of Work:

  • Project Management and Project Planning
  • Project Data & Document Management
  • Dismantling the Stacker rails in the Limestone/Clay warehouse and transporting it to the open warehouse area.
  • Demolition and removal of the existing concrete under the rails
  • Drilling the slots for the new threaded Rod and placing the rods with epoxy
  • Installation of new rails of the loading unit (Stacker) in accordance with the topographic code
  • Renewal of under-rail concrete
  • Development of the Project Specific Construction (including lifting plans), QA/QC, and HSE Documentation
  • Quality Control of the fabricated elements (Dimensional control, NDT of welding joints, Paint inspection etc.)
  • Final documentation and project delivery