Development of the Project Specific Construction, QA/QC, and HSE Documentation
Procurement of the materials
Mobilization
Cutting and removing plasterboard lining on the ceiling along the wall line in order to ensure that the wall rises up to the concrete ceiling
Preparation and installation of the frame from C profiles according to the drawing.
Insulation of profile gaps with 100 mm mineral stone wool (without gaps). Density ≥100kg/m³
Application of SoundGuard Membrene 3.9 S soundproofing material on the side of the wall intended for double plasterboard before the second layer of plasterboard.
Plastering of lining and facing plaster on the wall from both sides, painting of the wall
Covering the wall on both sides with MDF + Membrane coated material suitable for existing pans.